Projects 

• The Netherlands

MBF Structure Segmenting

A defective 1200 [tons] windmill foundation had to be segmented in a very short timespan in the Eemshaven, The Netherlands. A succesfull salvage operation contracted together with SMIT Salvage. With the load controlled by the 3.000 [tons] BOKALIFT 1 crane, our team has been able to segment the structure in a 48 [hrs] operation.

Remediation and dismantling of a powerhouse
Successful loading of MV OS 35 wreck!