Safety and environment always have the highest priority.

Enclosed site, so the surrounding environment is not burden.

The entire process, from the permits to the construction ready ground.

Recyclable materials, waste and hazardous materials are always separated at source.

News

KOOLE Contractors removes one of the viaducts in Badhoevedorp Industrial

KOOLE Contractors removes one of the viaducts in Badhoevedorp KOOLE and CBB are in cooperation, removing the six viaducts of the A9 at Badhoevedorp. This is the old route from the A9, through Badhoevedorp. In the meanwhile the first ones at the Plesmanlaan and Amsterdamse Baan are removed.

The Vacupress Environmental

The Vacupress The Vacupress Suction Vehicle can be used for any large or small job requiring small materials or contaminated materials to be removed. The Vacupress Suction Vehicle can be used for cleaning tank installations, sucking up dry matter for example sand, gravel and granulate, also asbestos contaminated material, emergency cleaning, industrial cleaning and ground cleaning.

KOOLE Contractors – The completion of a large remediation project Industrial

KOOLE Contractors – The completion of a large remediation project After a remediation of 1,5 years KOOLE Contractors removed the entire line from this 150 meter long hall. Also in the basement, all the equipment is removed. After the removal of the tiled floor and sub-floor, a brand new poured floor is installed. With the final commissioning our client received a great new storage room.

KOOLE Maritime Salvage was mentioned in the news; “Laatste uur geslagen voor dok” (final day has dawned for dock) Salvage

KOOLE Maritime Salvage was mentioned in the news; “Laatste uur geslagen voor dok” (final day has dawned for dock) KOOLE has started with the removal of the sunken dry dock at Lauwersoog. LEEUWARDEN COURANT (18 april, page 12)

New POWER TRUCK at KOOLE Contractors Contractors

New POWER TRUCK at KOOLE Contractors Last Friday, the 6th of April, a Volvo FH16 750 10x4 heavy transport tractor was delivered by the Volvo Group Truck Center Amsterdam. This special Volvo is equipped with all kinds of options, think of Dynamic Steering, fully integrated parking cooler, 10-tons front axle, bi-xenon, parking heater for cabin and engine. The Volvo is produced on a CO2 neutral basis and complies with the latest European emission standards. The Volvo is equipped with the latest gearbox, called Crawler Gear (I-shift). This benefits the RPM’s on the highway, resulting in economical use. Nooteboom has been able to combine our wishes and possibilities into a versatile trailer with a load capacity over 90 tons. The Euro low-loader type 122-24 (ICP) is delivered with an Interdolly-Compact. The low-loader is equipped with a total of 6 pendulum axle lines with a stroke of 600 mm and large steering angles which are aligned with the truck. The Euro low-loader also has quick-acting couplings for easy connecting and disconnecting of the neck and to make the hydraulic system pressure-free. Thanks to the auxiliary control with wireless remote control, the trailer will be able to maneuver better.

KOOLE Contractors invests in solar panels Contractors

KOOLE Contractors invests in solar panels KOOLE Contractors invests in green energy by installing almost 400 solar panels on top of the workshop.

Quick response at asbestos pollution Highway A4 Environmental

Quick response at asbestos pollution Highway A4 March 20th, KOOLE Contractors executed the remediation of the asbestos which had ended up on one of the lanes of the A4 highway to Amsterdam with urgency and accuracy. The asbestos pollution is cleaned up using the specially equipped vacuum truck (equipped with Hepa filter) the asbestos pollution was sucked away from the lanes. After a final inspection and approval by an independent laboratory all three lanes of the A4 Highway were again released for traffic around 00:45.

KOOLE Contractors successfully removed “EL MAUD” shipwreck at Galisbay, Saint-Martin Salvage

KOOLE Contractors successfully removed “EL MAUD” shipwreck at Galisbay, Saint-Martin Dredger "EL MAUD" ran aground 100 meters from the shore during the passage of Hurricane Lenny, November 1999. The wreck is degraded over the years and is no longer safe for tourists. In 2017 KOOLE Contractors is awarded to remove "EL MAUD" and clean the area for future development, unfortunately Hurricane Irma delayed the wreck removal operation. After Hurricane Irma, KOOLE starts helping with the emergency response on Saint- Martin, later KOOLE removed the wreck and cleaned the area around Marigot in an environmental friendly way.

KOOLE NV is moving to a new location Industrial

KOOLE NV is moving to a new location In order to give enough space to our mission and vision for the future, we can proudly announce that Koole NV will move to a more spacious and efficient location on the 29th of January 2018. . Our new address is KOOLE NV, Vaartkaai 51, 2170 Antwerp. We would kindly ask you to change your database and like to receive your correspondence on our new address, We’ve spent the last few months building a new warehouse and office space. The new location is near the Albertkanaal and is close to various projects and easily accessible via the highway and public transport. Koole NV stands for socially responsible and safe business. Our office therefore reflects this strong vision: modern spaces, ergonomically designed desks and the latest sustainable materials have been implemented to create the office and warehouse. Curious about our new offices? Be sure to check out the photos on our website. Hopefully we will meet each other soon in many new projects!

KOOLE Contractors prepares the spidercrane for operation Industrial

KOOLE Contractors prepares the spidercrane for operation The proprietary spidercrane is going to be hoisted on the roof of the power plant, here a hole will be drilled to a size of about 20 by 20 meters. Next, an auxiliary construction will be raised upwards to lower the two boilers one by one. Once on the ground, the boilers are redeemed from asbestos and disassembled. On the other side of the building, the electricity cables and a part of the ceiling are being removed.

KOOLE MAMMOET Salvage has successfully removed motor yacht the “Elsa” Salvage

KOOLE MAMMOET Salvage has successfully removed motor yacht the “Elsa” The motor yacht "Elsa" is stalled on the coast of Saba known as ‘Ladder Bay’ on 22 March. The wreck was a threat to the national marine reserve with her protective coral and fish species. An international salvage has made attempts to pull back the ship. After various failed attempts KOOLE MAMMOET Salvage has been given the contract to remove the ship in an environmentally friendly way. KOOLE MAMMOET Salvage was on site in July 2017 on site and has cut the ship into several pieces and removed it in a safe and environmentally friendly way. The operation was hampered by strong currents and waves. The operation was successfully completed and delivered to the Department of Public works.

KOOLE Contractors dismantling an air duct and portal Industrial

KOOLE Contractors dismantling an air duct and portal For some time now KOOLE is working on the demolition of the energy plant Harculo. In the video you see the demolition of an air duct and the take down of a portal from the engine room. The beams will be weakened with torch cutting and retracted with 50 tons excavators

KOOLE MAMMOET Salvage has successfully removed the “MV SIRENA” Salvage

KOOLE MAMMOET Salvage has successfully removed the “MV SIRENA” On August the 13th 2016, the ro-ro vessels the “MV SIRENA” ran aground on the rocks of Sint Eustatius, Caribbean. An attempt to refloat the vessel failed and as a result the ship broke in two pieces. The local weather conditions deteriorated the condition of the ship considerably. The “MV Sirena” ran aground at a challenging spot in the National Marine Park. The area is not only known for its beautiful coral reefs but especially for the extreme weather conditions and waves. After 60 days, the vessel was successfully removed by KOOLE MAMMOET Salvage without damaging the surrounding reefs.

KOOLE MAMMOET Salvage  brings limestone to Saba Salvage

KOOLE MAMMOET Salvage brings limestone to Saba KOOLE MAMMOET Salvage Crane and barge moving limestone for shoreline replacement, necessary after the damage done to Saba's southern coast by Hurricane Maria

KOOLE Contractors assisted firefighters at large fire Edam Environmental

KOOLE Contractors assisted firefighters at large fire Edam In the Centre of Edam a large fire occurred in a snack bar. Several fire departments from the area were called to come help put out the fire, KOOLE has contributed to this to be able to do this as safe as possible. We have secured the walls of the houses that were on the verge of collapse. Furthermore, we have removed the debris and the walls that were found to be unsafe so the Fire Department could do his work.

KOOLE Contractors in the news Salvage

KOOLE Contractors in the news Koole Contractors is mentioned on the news site of Saint Martin. They write that the ship "El Maud" has been removed successfully. Click on the link to go to this article.

KOOLE Contractors makes preparation prior to the drop of the turbine table Industrial

KOOLE Contractors makes preparation prior to the drop of the turbine table KOOLE Contractors started with disassembling of the gas turbine - hall and the turbine table. The film also shows how the platforms are cut away using a platform crane. Containments are built to safely clean the boiler

KOOLE Contractors starts with the dismantling of the machine hall Industrial

KOOLE Contractors starts with the dismantling of the machine hall KOOLE Contractors starts with the dismantling of the machine hall that once housed the steam powered generation units at Harculo, Zwolle. The 250m long building will be dismantled in sections of 40 metres.

KOOLE Contractors assist firefighters with extinguishing fire at thrift shop Rataplan in Amsterdam Westpoort. Environmental

KOOLE Contractors assist firefighters with extinguishing fire at thrift shop Rataplan in Amsterdam Westpoort. Triftshop Rataplan located at the Generatorstraat in Westpoort is destroyed by a huge fire on Sunday to Monday night. KOOLE Contractors has been asked to assist the firefighters in extinguishing the fire. The fire was under control around five o'clock.

Koole Contractors offer help to St. Maarten Salvage

Koole Contractors offer help to St. Maarten Message posted by "VNW-representation of the Netherlands in Willemstad" on Facebook. Many individuals offered relief (goods) for St. Maarten the last few days. Saturday morning the KTK-tug Orca left with a barge of Koole in direction of Windward Islands, they made space available aboard for relief supplies. Beautiful! All the support for people in need on the Windward Islands. Thanks for all contributions.

KOOLE Contractors cleans the elecrticity grids foundations in Nieuw-Vennep Environmental

KOOLE Contractors cleans the elecrticity grids foundations in Nieuw-Vennep In order to provide sufficient capacity for electricity transport in the region in the coming years, the 380 kv high-voltage connection in the Randstad will be expanded over the next few years, commissioned by TenneT. KOOLE Contractors use his Vacu-Press to contribute to the realization of Lot 1 of the North-South Ring between the Southern Ringvaart and Vijfhuizen. Van Hattum and Blankevoort realizes the concrete work for the foundations of the high-voltage masts and the Vacu-Press is used to suck sludge after the pouring of underwater concrete.

KOOLE Contractors have secured storage space in Amsterdam Environmental

KOOLE Contractors have secured storage space in Amsterdam On the 29st of may this year a big fire has occurred in the western port area of Amsterdam. The fire started around 19:30 at a waste disposal company on the Kajuitweg. The fire burned out under supervision of the Fire Brigade and prevented any additional damage to the surrounding area. KOOLE secured the burned storage space from collapsing. KOOLE demolished the burned building and sorted the materials and discharged them.

KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall at Antwerp Salvage

KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall at Antwerp KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall with the Liebherr HS 895 HD 200 tonne on a barge at the “Scheldekaaien” in Antwerp. The old Kaai of more than 5km get a facelift. The historic unstable quay wall is demolished for a new quay wall with a historic touch. The solid quay has been demolished with an controlled explosion so that the fragments can be removed more easily.

KOOLE Contractors assisted the client from Vilvoorde to transport two turbines Salvage

KOOLE Contractors assisted the client from Vilvoorde to transport two turbines KOOLE Contractors assisted the client from Vilvoorde to transport two "frame 5 gas turbine", each of which has a weight of one hundred tons. KOOLE has hoisted the two frames out of the ship and transported them by trailer to the desired location.

Next newsitem

Trackrecord

Inovyn, Schkopau, Germany

2017-10 Inovyn, Schkopau, Germany

Dismantling of three PVC-production lines in Schkopau, Germany.

Borealis AB, Stenungsund, Sweden

2017-03 Borealis AB, Stenungsund, Sweden

Partial demolition of an Ethylene Cracker (Furnace E) on a live chemical plant in a tight 8 week schedule, including structural reinforcement works. Part of the four year Stenungsund Furnace Revamp Project (SFRP) of which KOOLE is contracted to dismantle the four furnaces for revamping.

VTTI Eurotank Amsterdam, the Netherlands

2017-02 VTTI Eurotank Amsterdam, the Netherlands

Dismantling and removal of floating tank roofs at the ETA Terminal in Amsterdam

Leuze-en-Hainaut, Belgium

2017-01 Leuze-en-Hainaut, Belgium

Leuze-en-Hainaut, Belgium - The removal of a production building of a potato processor. This project comprised of the dismantling of the entire production line, including conveyor belts, screeners, wash drums and pipelines.

ENGIE Centrale Harculo, Zwolle

2017-01 ENGIE Centrale Harculo, Zwolle

Currently in execution is the turn-key decommissioning of the 350MW thermal power plant “Harculo” in the Netherlands, owned by ENGIE.

Arcelor

2016-12 Arcelor

Zelzate, Belgium - Dismantling a recuperator for a steel manufacturer. Also the ventilation channels and fan were cut loose and removed. The large components were transported to the lay-down area using two crawler cranes.

Gunvor

2016-11 Gunvor

Rotterdam, the Netherlands - Removal of thirteen oil tanks. The height of the tanks varies from 5 to 14 meters high. Some of the tanks contained a small amount of asbestos and waste product. This is also remediated by KOOLE.

Eurotank Amsterdam

2016-06 Eurotank Amsterdam

Amsterdam, the Netherlands - The disassembling and relocating of multiple oil tanks.

NUFARM chemical plant

2016-03 NUFARM chemical plant

Rotterdam, the Netherlands - Complete demolition/dismantling of a chemical plant in Rotterdam, including asbestos remediation.

Eurotank Amsterdam

2016-02 Eurotank Amsterdam

Amsterdam, the Netherlands - Demolition and asbestos remediation of several oil installations, tanks and piping on ETA oil terminal.

Evonik

2016-01 Evonik

Antwerp, Belgium - Demolition of chemical plant.

Total, Feluy, Belgium

2016-01 Total, Feluy, Belgium

Demolition of twelve oil tanks.

Arcelor Mittal, Liege, Belgium

2015-06 Arcelor Mittal, Liege, Belgium

Demolition of a chimney with our remote controlled demolition crane.

E.On Central Galileistraat

2015-02 E.On Central Galileistraat

Rotterdam, the Netherlands - Complete demolition/dismantling of a 220 MW power plant in Rotterdam.

GDF SUEZ Maximacentrale Lelystad

2015-02 GDF SUEZ Maximacentrale Lelystad

Complete demolition/dismantling of the 875 MW Maxima power plant in Lelystad.

TATA Steel, IJmuiden, The Netherlands

2015-01 TATA Steel, IJmuiden, The Netherlands

Removal of a water tank at a steel plant.

Demolition bitumen plant Oil Terminal

2014-09 Demolition bitumen plant Oil Terminal

Lagos, Nigeria - Demolition of a bitumen plant at Oando PLC's Terminal 1. The bitumen plant consisted of four steel tanks, various buildings with asbestos contaminations, process related piping, loading gantries and various foundations.

Carmeuse: Aisemont, Belgium

2014-02 Carmeuse: Aisemont, Belgium

Demolition of several process lines.

Total

2014-01 Total

Le Havre, Belgium - Dismantling of several installations and tanks.

Rubis Terminal Dunkirk, France

2014-01 Rubis Terminal Dunkirk, France

Demolition of a tank.

Lhoist St. Georges, Belgium

2014-01 Lhoist St. Georges, Belgium

Demolition several buildings and tanks

Umicore Olen, Belgium

2014-01 Umicore Olen, Belgium

Several dismantling and demolition projects.

Monument Chemical, Belgium

2014-01 Monument Chemical, Belgium

Demolition of two tanks.

Total Le Havre, France

2014-01 Total Le Havre, France

Demolition of 5 tanks.

Fluxys Zeebrugge, Belgium

2014-01 Fluxys Zeebrugge, Belgium

Demolition/dismantling of terminal including two LNG tanks.

Solvay Antwerp,Belgium

2014-01 Solvay Antwerp,Belgium

Dismantling of mercury process unit and several buildings.

NLR

2013-11 NLR

Amsterdam, the Netherlands - Remediation of 8 buildings.

Aquafin

2013-01 Aquafin

Deurne, Belgium - Removal of walls after collapse.

Tata Steel

2013-01 Tata Steel

IJmuiden, the Netherlands - Removal of two boilers (boiler 21 and 22).

GSK

2013-01 GSK

Rixenart, Belgium - Dismantling cooling water lines.

Industeel

2013-01 Industeel

Charleroi, Belgium - Soil remediation.

CEI-De Meyer

2013-01 CEI-De Meyer

Duffel, Belgium - Removal of railroad viaduct at Duffel Belgium.

Janssen Farmaceutica

2013-01 Janssen Farmaceutica

Beerse, Belgium - Demolition of a pilot plant.

Oiltanking

2013-01 Oiltanking

Antwerp, Belgium - Demolition of several tanks.

Sagrex

2013-01 Sagrex

Sagrex, Belgium - Dismantling of crushing line of the Quenast quarry.

Palm

2013-01 Palm

Steenhuffel, Belgium - Demolition of several process lines.

Smurfit Kappa

2012-01 Smurfit Kappa

Roermond, the Netherlands - Demolition of a watertank.

Borealis

2012-01 Borealis

Beringen, Belgium - Demolition of an HDPE plant.

Styrolution

2012-01 Styrolution

Antwerp, Belgium - Demolition of concrete constructions.

Air liquide

2012-01 Air liquide

Seraing, Belgium - Demolition of a 600 T2 Nebulizer.

Monument Chemicals

2012-01 Monument Chemicals

Antwerpen, Belgium - Demolition chimneys and several installations.

ExxonMobil

2012-01 ExxonMobil

Antwerp, Belgium - Demolition of the Hydrotreater at the Performance Intermediates Plant in Antwerp.

Fuji Oil

2012-01 Fuji Oil

Ghent, Belgium - Demolition of EVRA.

Ineos

2012-01 Ineos

Geel, Belgium - Demolition of spheres.

ATPC Terminal

2012-01 ATPC Terminal

Antwerp, Belgium - Creation of several concrete openings at the VTTI oil terminal.

Umicore

2012-01 Umicore

Olen, Belgium - Removal of the 74 meter high brouhon tower and part of the process installations.

Praxair

2012-01 Praxair

Oevel, Belgium - Removal of the coldbox and installations.

Removal theatre

2012-01 Removal theatre

Helmond, the Netherlands - Removal of theatre 't Speelhuis which was destroyed during a heavy fire.

BASF

2011-01 BASF

Feluy, Belgium - Removal of several installations and two chimneys with a height of 100 meters. The chimneys were removed by means of remote controlled unmanned demolition crane and FRACO system.

SPE Gent

2011-01 SPE Gent

Ghent, Belgium - Demolition of inlet duct.

Katoen Natie

2011-01 Katoen Natie

Antwerp, Belgium - Remediation of buildings damaged by fire.

Sadaci

2011-01 Sadaci

Ghent, Belgium - Demolition of molybdenum-aluminum furnaces.

NEOCHIM

2011-01 NEOCHIM

Feluy, Belgium - Demolition of several tanks at the NEOCHIM biodiesel and glycerine plant in Feluy.

Pier van Scheveningen

2011-01 Pier van Scheveningen

Scheveningen, The Netherlands - Removal of building on pier, which was destroyed during a fire. Burned residue was transported by helicopter.

DSM

2011-01 DSM

IJmuiden, The Netherlands - Removal of the complete DSM plant with an area of 130,000 m². The plant consisted of 40 building, including cooling towers, a 120 meter high chimney, foundations, absorption columns and office buildings.

Dutch Public Works & Water Management department

2010-04 Dutch Public Works & Water Management department

Location: Rotterdam - Description: Remediation of control rooms various tunnels.

Shell Gas

2010-01 Shell Gas

Heembeek, Belgium - Asbestos remediation & removal of complete tank complex with an area of 8 hectares.

C.P. Kelco

2010-01 C.P. Kelco

Genk, Belgium - Demolition of buildings after explosion.

Arcelor Mittal

2008-01 Arcelor Mittal

France - Removal of a bridge by means of heavy lifting.

Shell

2008-01 Shell

Antwerp, Belgium - Removal of gas depot.

Van Haerents

2007-01 Van Haerents

Ghent, Belgium - Demolition & asbestos remediation activities.

Ardagh Glass

2007-01 Ardagh Glass

Dongen, the Netherlands - Several demolition activities.

Akzo Nobel

2007-01 Akzo Nobel

Amsterdam, the Netherlands - Several demolition activities on the ZBW Plant.

BASF, Belgium

2006-04 BASF, Belgium

Removal of tanks and reactors at the chemical plants in Feluy and Antwerp

GDF Suez

2006-02 GDF Suez

Location: Lelystad - Description: Demolition and remediation Flevo 1.

Electrabel

2006-01 Electrabel

Lelystad, the Netherlands - Complete removal of Flevocentrale powerplant.

2017-10 Inovyn, Schkopau, Germany

Dismantling of three PVC-production lines in Schkopau, Germany.

Inovyn, Schkopau, Germany

2017-03 Borealis AB, Stenungsund, Sweden

Partial demolition of an Ethylene Cracker (Furnace E) on a live chemical plant in a tight 8 week schedule, including structural reinforcement works. Part of the four year Stenungsund Furnace Revamp Project (SFRP) of which KOOLE is contracted to dismantle the four furnaces for revamping.

Borealis AB, Stenungsund, Sweden

2017-02 VTTI Eurotank Amsterdam, the Netherlands

Dismantling and removal of floating tank roofs at the ETA Terminal in Amsterdam

VTTI Eurotank Amsterdam, the Netherlands

2017-01 Leuze-en-Hainaut, Belgium

Leuze-en-Hainaut, Belgium - The removal of a production building of a potato processor. This project comprised of the dismantling of the entire production line, including conveyor belts, screeners, wash drums and pipelines.

Leuze-en-Hainaut, Belgium

2017-01 ENGIE Centrale Harculo, Zwolle

Currently in execution is the turn-key decommissioning of the 350MW thermal power plant “Harculo” in the Netherlands, owned by ENGIE.

ENGIE Centrale Harculo, Zwolle

2016-12 Arcelor

Zelzate, Belgium - Dismantling a recuperator for a steel manufacturer. Also the ventilation channels and fan were cut loose and removed. The large components were transported to the lay-down area using two crawler cranes.

Arcelor

2016-11 Gunvor

Rotterdam, the Netherlands - Removal of thirteen oil tanks. The height of the tanks varies from 5 to 14 meters high. Some of the tanks contained a small amount of asbestos and waste product. This is also remediated by KOOLE.

Gunvor

2016-06 Eurotank Amsterdam

Amsterdam, the Netherlands - The disassembling and relocating of multiple oil tanks.

Eurotank Amsterdam

2016-03 NUFARM chemical plant

Rotterdam, the Netherlands - Complete demolition/dismantling of a chemical plant in Rotterdam, including asbestos remediation.

NUFARM chemical plant

2016-02 Eurotank Amsterdam

Amsterdam, the Netherlands - Demolition and asbestos remediation of several oil installations, tanks and piping on ETA oil terminal.

Eurotank Amsterdam

2016-01 Evonik

Antwerp, Belgium - Demolition of chemical plant.

Evonik

2016-01 Total, Feluy, Belgium

Demolition of twelve oil tanks.

Total, Feluy, Belgium

2015-06 Arcelor Mittal, Liege, Belgium

Demolition of a chimney with our remote controlled demolition crane.

Arcelor Mittal, Liege, Belgium

2015-02 E.On Central Galileistraat

Rotterdam, the Netherlands - Complete demolition/dismantling of a 220 MW power plant in Rotterdam.

E.On Central Galileistraat

2015-02 GDF SUEZ Maximacentrale Lelystad

Complete demolition/dismantling of the 875 MW Maxima power plant in Lelystad.

GDF SUEZ Maximacentrale Lelystad

2015-01 TATA Steel, IJmuiden, The Netherlands

Removal of a water tank at a steel plant.

TATA Steel, IJmuiden, The Netherlands

2014-09 Demolition bitumen plant Oil Terminal

Lagos, Nigeria - Demolition of a bitumen plant at Oando PLC's Terminal 1. The bitumen plant consisted of four steel tanks, various buildings with asbestos contaminations, process related piping, loading gantries and various foundations.

Demolition bitumen plant Oil Terminal

2014-02 Carmeuse: Aisemont, Belgium

Demolition of several process lines.

Carmeuse: Aisemont, Belgium

2014-01 Total

Le Havre, Belgium - Dismantling of several installations and tanks.

Total

2014-01 Rubis Terminal Dunkirk, France

Demolition of a tank.

Rubis Terminal Dunkirk, France

2014-01 Lhoist St. Georges, Belgium

Demolition several buildings and tanks

Lhoist St. Georges, Belgium

2014-01 Umicore Olen, Belgium

Several dismantling and demolition projects.

Umicore Olen, Belgium

2014-01 Monument Chemical, Belgium

Demolition of two tanks.

Monument Chemical, Belgium

2014-01 Total Le Havre, France

Demolition of 5 tanks.

Total Le Havre, France

2014-01 Fluxys Zeebrugge, Belgium

Demolition/dismantling of terminal including two LNG tanks.

Fluxys Zeebrugge, Belgium

2014-01 Solvay Antwerp,Belgium

Dismantling of mercury process unit and several buildings.

Solvay Antwerp,Belgium

2013-11 NLR

Amsterdam, the Netherlands - Remediation of 8 buildings.

NLR

2013-01 Aquafin

Deurne, Belgium - Removal of walls after collapse.

Aquafin

2013-01 Tata Steel

IJmuiden, the Netherlands - Removal of two boilers (boiler 21 and 22).

Tata Steel

2013-01 GSK

Rixenart, Belgium - Dismantling cooling water lines.

GSK

2013-01 Industeel

Charleroi, Belgium - Soil remediation.

Industeel

2013-01 CEI-De Meyer

Duffel, Belgium - Removal of railroad viaduct at Duffel Belgium.

CEI-De Meyer

2013-01 Janssen Farmaceutica

Beerse, Belgium - Demolition of a pilot plant.

Janssen Farmaceutica

2013-01 Oiltanking

Antwerp, Belgium - Demolition of several tanks.

Oiltanking

2013-01 Sagrex

Sagrex, Belgium - Dismantling of crushing line of the Quenast quarry.

Sagrex

2013-01 Palm

Steenhuffel, Belgium - Demolition of several process lines.

Palm

2012-01 Smurfit Kappa

Roermond, the Netherlands - Demolition of a watertank.

Smurfit Kappa

2012-01 Borealis

Beringen, Belgium - Demolition of an HDPE plant.

Borealis

2012-01 Styrolution

Antwerp, Belgium - Demolition of concrete constructions.

Styrolution

2012-01 Air liquide

Seraing, Belgium - Demolition of a 600 T2 Nebulizer.

Air liquide

2012-01 Monument Chemicals

Antwerpen, Belgium - Demolition chimneys and several installations.

Monument Chemicals

2012-01 ExxonMobil

Antwerp, Belgium - Demolition of the Hydrotreater at the Performance Intermediates Plant in Antwerp.

ExxonMobil

2012-01 Fuji Oil

Ghent, Belgium - Demolition of EVRA.

Fuji Oil

2012-01 Ineos

Geel, Belgium - Demolition of spheres.

Ineos

2012-01 ATPC Terminal

Antwerp, Belgium - Creation of several concrete openings at the VTTI oil terminal.

ATPC Terminal

2012-01 Umicore

Olen, Belgium - Removal of the 74 meter high brouhon tower and part of the process installations.

Umicore

2012-01 Praxair

Oevel, Belgium - Removal of the coldbox and installations.

Praxair

2012-01 Removal theatre

Helmond, the Netherlands - Removal of theatre 't Speelhuis which was destroyed during a heavy fire.

Removal theatre

2011-01 BASF

Feluy, Belgium - Removal of several installations and two chimneys with a height of 100 meters. The chimneys were removed by means of remote controlled unmanned demolition crane and FRACO system.

BASF

2011-01 SPE Gent

Ghent, Belgium - Demolition of inlet duct.

SPE Gent

2011-01 Katoen Natie

Antwerp, Belgium - Remediation of buildings damaged by fire.

Katoen Natie

2011-01 Sadaci

Ghent, Belgium - Demolition of molybdenum-aluminum furnaces.

Sadaci

2011-01 NEOCHIM

Feluy, Belgium - Demolition of several tanks at the NEOCHIM biodiesel and glycerine plant in Feluy.

NEOCHIM

2011-01 Pier van Scheveningen

Scheveningen, The Netherlands - Removal of building on pier, which was destroyed during a fire. Burned residue was transported by helicopter.

Pier van Scheveningen

2011-01 DSM

IJmuiden, The Netherlands - Removal of the complete DSM plant with an area of 130,000 m². The plant consisted of 40 building, including cooling towers, a 120 meter high chimney, foundations, absorption columns and office buildings.

DSM

2010-04 Dutch Public Works & Water Management department

Location: Rotterdam - Description: Remediation of control rooms various tunnels.

Dutch Public Works & Water Management department

2010-01 Shell Gas

Heembeek, Belgium - Asbestos remediation & removal of complete tank complex with an area of 8 hectares.

Shell Gas

2010-01 C.P. Kelco

Genk, Belgium - Demolition of buildings after explosion.

C.P. Kelco

2008-01 Arcelor Mittal

France - Removal of a bridge by means of heavy lifting.

Arcelor Mittal

2008-01 Shell

Antwerp, Belgium - Removal of gas depot.

Shell

2007-01 Van Haerents

Ghent, Belgium - Demolition & asbestos remediation activities.

Van Haerents

2007-01 Ardagh Glass

Dongen, the Netherlands - Several demolition activities.

Ardagh Glass

2007-01 Akzo Nobel

Amsterdam, the Netherlands - Several demolition activities on the ZBW Plant.

Akzo Nobel

2006-04 BASF, Belgium

Removal of tanks and reactors at the chemical plants in Feluy and Antwerp

BASF, Belgium

2006-02 GDF Suez

Location: Lelystad - Description: Demolition and remediation Flevo 1.

GDF Suez

2006-01 Electrabel

Lelystad, the Netherlands - Complete removal of Flevocentrale powerplant.

Electrabel
Next Trackrecord

Cases

GDF Suez Maxima-Central

GDF Suez Maxima-Central >>

The activities of the Maxima-Central were limited for some time, this resulted in the complete closure and remediation of the plant. KOOLE was contracted to decommission the power plant. Production units FL30 and FL32 and all surrounding buildings were completely dismantled. KOOLE was responsible for the entire project, from the initial preparation to making the terrain construction-ready.

Demolition of no longer operational Fluxys LNG reservoirs

Demolition of no longer operational Fluxys LNG reservoirs >>

Removal of two LNG tanks (diameter of approx. 50m) with all accompanying installations. Also extensive soil work performed.

BASF

BASF >>

Due to evolving technologies and insights, the plants of chemical company BASF are subject to continuous change. On the Feluy site in Belgium, for instance, a 10 hectare area with various installations became redundant. The two most striking objects were chimneys of respectively 110 and 65 metres high. In addition to the two chimneys, KOOLE delivered the area in 6 months, fully ready for construction. The demolition included a range of objects such as gas spheres, reactors and pipeline routes and eventually the separated disposal of the waste. On a few nearby sites, large storage tanks (with a 30 metre diameter) were also removed.

  • KOOLE head office
  • Vijfhuizerdijk 110
  • 2141 BD Vijfhuizen
  • The Netherlands
  • T +31(0)23 558 19 37
  • KOOLE nv
  • Vaartkaai 51
  • 2170 Antwerp
  • Belgium
  • T +32(0)347 50 78 3
  • KOOLE GmbH
  • Siemensstraße 31
  • 47533 Kleve
  • Deutschland
  • T +49(0)28219773310
  •  
Back to top