KOOLE Contractors dismantling an air duct and portal Industrial

KOOLE Contractors dismantling an air duct and portal For some time now KOOLE is working on the demolition of the energy plant Harculo. In the video you see the demolition of an air duct and the take down of a portal from the engine room. The beams will be weakened with torch cutting and retracted with 50 tons excavators

KOOLE MAMMOET Salvage has successfully removed the “MV SIRENA” Salvage

KOOLE MAMMOET Salvage has successfully removed the “MV SIRENA” On August the 13th 2016, the ro-ro vessels the “MV SIRENA” ran aground on the rocks of Sint Eustatius, Caribbean. An attempt to refloat the vessel failed and as a result the ship broke in two pieces. The local weather conditions deteriorated the condition of the ship considerably. The “MV Sirena” ran aground at a challenging spot in the National Marine Park. The area is not only known for its beautiful coral reefs but especially for the extreme weather conditions and waves. After 60 days, the vessel was successfully removed by KOOLE MAMMOET Salvage without damaging the surrounding reefs.

KOOLE MAMMOET Salvage  brings limestone to Saba Salvage

KOOLE MAMMOET Salvage brings limestone to Saba KOOLE MAMMOET Salvage Crane and barge moving limestone for shoreline replacement, necessary after the damage done to Saba's southern coast by Hurricane Maria

KOOLE Contractors assisted firefighters at large fire Edam Environmental

KOOLE Contractors assisted firefighters at large fire Edam In the Centre of Edam a large fire occurred in a snack bar. Several fire departments from the area were called to come help put out the fire, KOOLE has contributed to this to be able to do this as safe as possible. We have secured the walls of the houses that were on the verge of collapse. Furthermore, we have removed the debris and the walls that were found to be unsafe so the Fire Department could do his work.

KOOLE Contractors in the news Salvage

KOOLE Contractors in the news Koole Contractors is mentioned on the news site of Saint Martin. They write that the ship "El Maud" has been removed successfully. Click on the link to go to this article.

KOOLE Contractors makes preparation prior to the drop of the turbine table Industrial

KOOLE Contractors makes preparation prior to the drop of the turbine table KOOLE Contractors started with disassembling of the gas turbine - hall and the turbine table. The film also shows how the platforms are cut away using a platform crane. Containments are built to safely clean the boiler

KOOLE Contractors starts with the dismantling of the machine hall Industrial

KOOLE Contractors starts with the dismantling of the machine hall KOOLE Contractors starts with the dismantling of the machine hall that once housed the steam powered generation units at Harculo, Zwolle. The 250m long building will be dismantled in sections of 40 metres.

KOOLE Contractors assist firefighters with extinguishing fire at thrift shop Rataplan in Amsterdam Westpoort. Environmental

KOOLE Contractors assist firefighters with extinguishing fire at thrift shop Rataplan in Amsterdam Westpoort. Triftshop Rataplan located at the Generatorstraat in Westpoort is destroyed by a huge fire on Sunday to Monday night. KOOLE Contractors has been asked to assist the firefighters in extinguishing the fire. The fire was under control around five o'clock.

Koole Contractors offer help to St. Maarten Salvage

Koole Contractors offer help to St. Maarten Message posted by "VNW-representation of the Netherlands in Willemstad" on Facebook. Many individuals offered relief (goods) for St. Maarten the last few days. Saturday morning the KTK-tug Orca left with a barge of Koole in direction of Windward Islands, they made space available aboard for relief supplies. Beautiful! All the support for people in need on the Windward Islands. Thanks for all contributions.

KOOLE Contractors cleans the elecrticity grids foundations in Nieuw-Vennep Environmental

KOOLE Contractors cleans the elecrticity grids foundations in Nieuw-Vennep In order to provide sufficient capacity for electricity transport in the region in the coming years, the 380 kv high-voltage connection in the Randstad will be expanded over the next few years, commissioned by TenneT. KOOLE Contractors use his Vacu-Press to contribute to the realization of Lot 1 of the North-South Ring between the Southern Ringvaart and Vijfhuizen. Van Hattum and Blankevoort realizes the concrete work for the foundations of the high-voltage masts and the Vacu-Press is used to suck sludge after the pouring of underwater concrete.

KOOLE Contractors have secured storage space in Amsterdam Environmental

KOOLE Contractors have secured storage space in Amsterdam On the 29st of may this year a big fire has occurred in the western port area of Amsterdam. The fire started around 19:30 at a waste disposal company on the Kajuitweg. The fire burned out under supervision of the Fire Brigade and prevented any additional damage to the surrounding area. KOOLE secured the burned storage space from collapsing. KOOLE demolished the burned building and sorted the materials and discharged them.

KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall at Antwerp Salvage

KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall at Antwerp KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall with the Liebherr HS 895 HD 200 tonne on a barge at the “Scheldekaaien” in Antwerp. The old Kaai of more than 5km get a facelift. The historic unstable quay wall is demolished for a new quay wall with a historic touch. The solid quay has been demolished with an controlled explosion so that the fragments can be removed more easily.

KOOLE Contractors assisted the client from Vilvoorde to transport two turbines Salvage

KOOLE Contractors assisted the client from Vilvoorde to transport two turbines KOOLE Contractors assisted the client from Vilvoorde to transport two "frame 5 gas turbine", each of which has a weight of one hundred tons. KOOLE has hoisted the two frames out of the ship and transported them by trailer to the desired location.

KOOLE Contractors is currently dismantling a pvc-plant in Germany Industrial

KOOLE Contractors is currently dismantling a pvc-plant in Germany KOOLE Contractors is currently dismantling a pvc-plant in Germany. The scope of work consists of remediation works, removal of process installations by means of reverse engineering, relocation of installations and demolition of buildings, electrotechnical installations and piping bridges. The plant is located on the industrial estate of a large chemical company, housing several live plants. In the vicinity of the plant buildings and installations that are part of the dismantling scope, several buildings, installations and piping bridges are located which are in operation throughout the demolition project. To prevent that any of the operations is interrupted by our activities, utmost care attention is paid to working methodologies, safety aspects and phasing of our activities. Up till now, KOOLE Contractors has relocated a substantial number of process installations to other production locations in Sweden, Belgium, Spain and France.

KOOLE Contractors assisted firefighters Environmental

KOOLE Contractors assisted firefighters KOOLE Contractors assisted firefighters in extinguishing a business complex in the Western port area of Amsterdam.

Dismanteling of chimneys at Harculo Zwolle Industrial

Dismanteling of chimneys at Harculo Zwolle At ten o’clock on Saturday 18 March the two chimneys with a height of 112 metres, of the former power station on the IJsselcentraleweg in Zwolle, were brought down according to plan using payload. After a signal was given twice with a horn, and the towers were lying down on the ground within ten seconds. The dismantling of these chimneys is an important part of the total demolition of the Harculo Plant.

600 cars removed from car carrier Salvage

600 cars removed from car carrier In October a fire broke out on board the in Antwerp moored car carrier Silver Sky. It took three days before the fire was extinguished. At the time of the outbreak of the fire, the ship was loaded with used cars that were designated for Africa. The cars suffered irreparable damage by the fire. About 600 burned cars are removed by KOOLE Contractors from the 182 meter long car carrier. The cars were taken from the ship using wheel loaders and lined up on the dock. The vehicles with fire damage are treated as hazardous materials, and further processed that meets specific safety requirements.

KOOLE MAMMOET Salvage refloats barge in United Arab Emirates Salvage

KOOLE MAMMOET Salvage refloats barge in United Arab Emirates On February 16 has KOOLE MAMMOET Salvage completed a salvage operation of a on a breakwater stranded barge at Mina Saqr Port in the United Arab Emirates. During the inspection, significant damage was detected on starboard side. Due to the damage the barge lost its buoyancy on starboard side. The refloating plan comprised of putting the damaged tanks under air pressure. After regaining buoyancy the barge was removed from the breakwater with the help of a tugboat and transported to Dubai Drydocks. This 70 nautical miles (130 km) trip took 20 hours.

Removal of pipelines and floating tank roofs Eurotank Amsterdam Industrial

Removal of pipelines and floating tank roofs Eurotank Amsterdam Eurotank Amsterdam contracted KOOLE Contractors for the removal of pipelines and “floating” tank roofs. Before the start of the decommissioning operations the pipes were drained and flushed to ensure that there was no oil residue left in the pipes. The pipes were cut in small pieces with the "cold cutting" method. With this method there is no blow torch used. This reduces the risk of fire and explosions when cutting oil pipelines. Tank roofs Besides removing the pipelines, KOOLE also removed three floating tank roofs. These roofs float on the liquid in the tank to prevent the liquids to vaporize and to reduce the risk of air pollution. The metal roofs of the empty tanks were cut into pieces with the help of a crawler crane equipped with a hydraulic shear. All materials were cut into small pieces and disposed in containers.

Dismantling a 60 meter high chimney in Vlissingen Industrial

Dismantling a 60 meter high chimney in Vlissingen KOOLE Contractors was contracted to dismantle a chimney in Vlissingen. With the help of the spidercrane is the 60 meter high chimney dismantled to a rest height of 28 meters. The spidercrane dismantled the concrete shaft systematically, the debris is disposed inwards. This method provides an alternative as opposed to toppling a chimney, which affects the environment. The spidercrane is an unmanned and remote controlled excavator with four hydraulic feet, that is positioned on top of the chimney. The spidercrane is equipped with a series of radio transmitters and HD cameras. With the help of remote controls and LED monitors can the crane operator accurately control the excavator. The cabin is at a safe distance on the ground, in which the operator can concentrate on his work.

KOOLE Contractors starts dismantling project in Sweden Industrial

KOOLE Contractors starts dismantling project in Sweden Borealis has contracted KOOLE Contractors for the removal of an ethylene cracker in Stenungsund, Sweden. KOOLE has recently mobilized the necessary equipment and personnel to Sweden and has started the dismantling. The Austrian company Borealis is a manufacturer of polyolefins, chemicals and fertilizers, with offices and production locations throughout Europe, including Sweden. An ethylene cracker uses a high temperature to break apart molecules, for further processing in the petrochemical industry. Dismantling Furnace E is part of a multi-year renovation plan for multiple ‘crackers’. The project comprises of the partial dismantling of the cracker, the corresponding pipelines and refractory material lining. The installation contains asbestos, which will also be removed by KOOLE under strict protocol. Approximately 380 tons of steel and 250 tons of refractory stone material will be disposed during the operation. The dismantling has started in January 2017 and it will take approximately eight weeks to complete. After handover to the client a piping and mechanical contractor will start rebuilding the furnace. KOOLE has an extensive track record in dismantling industrial installations. However this project has specific characteristics. For example, the cold winter in Sweden requires the necessary precautions, such as measures for frozen roads and a snow-covered work site.

KOOLE Contractors receives authorization for asbestos removal in Sweden Environmental

KOOLE Contractors receives authorization for asbestos removal in Sweden From now on KOOLE Contractors is qualified to remove asbestos in Sweden. KOOLE has received authorization, because it meets the specific safety regulations to remove asbestos. Besides Sweden KOOLE was already qualified to remove asbestos in Belgium and the Netherlands. KOOLE Contractors is currently working on a decommissioning project in Stenungsund, Sweden, in which asbestos must be removed.

Dismantling potato processor in Belgium Industrial

Dismantling potato processor in Belgium In Leuze-en-Hainaut, Belgium, KOOLE Contractors has removed a production building of a potato processor. This project comprised of the dismantling of the entire production line, including conveyor belts, screeners, wash drums and pipelines. After dismantling the production line, the entire warehouse was being removed. The removal was done by two crawler cranes. The various materials were separated at source and disposed. The installation did not contain any asbestos or other environmentally harmful substances. Within five weeks the entire installation and warehouse was removed.

Removing a recuperator in Zelzate Industrial

Removing a recuperator in Zelzate For a steel manufacturing corporation in Zelzate, Belgium, KOOLE Contractors has removed a recuperator. Recuperators are used in the production of steel in order to recover waste heat, so it’s not lost. The first phase of this project was to cut loose and remove the ventilation channels and fan, then the recuperator of furnace 3 was dismantled. The large components were transported to the lay-down area using two crawler cranes. The different materials (stone and metal) were separated at the source and disposed. The installation did not contain any asbestos or other environmentally harmful substances.

Next newsitem

Trackrecord

KOOLE MAMMOET Salvage offered aid to Saint Martin

2017-11 KOOLE MAMMOET Salvage offered aid to Saint Martin

KOOLE has completed various operations and wreck salvages. We have helped to restore the port and discharging naval vessels loaded with material for the reconstruction of the island.

KOOLE MAMMOET Salvage has launched the “BEACHCOMBER VII” successfully

2017-10 KOOLE MAMMOET Salvage has launched the “BEACHCOMBER VII” successfully

KOOLE MAMMOET Salvage has rolled back the "BEACHCOMBER VII", by using a self-created slipway of steel pipes, over the beach to the sea.

KOOLE MAMMOET Salvage brings back the “MV JENIN” to owner

2017-09 KOOLE MAMMOET Salvage brings back the “MV JENIN” to owner

The "MV JENIN" was put upright but bad weather made a lifting operation impossible. The "MV JENIN" was moved underwater to a better location awaiting better weather conditions. The "MV JENIN" was transported back to its owners in Umm Al Qwain.

KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, Sint Maarten

2017-08 KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, Sint Maarten

KOOLE MAMMOET Salvage obtained the contract to remove the "EL MAUD" and clean its close surroundings so that the area can be further developed in the future.

KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, St. Maarten

2017-08 KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, St. Maarten

KOOLE MAMMOET Salvage obtained the contract to remove the "EL MAUD" and clean its close surroundings so that the area can be further developed in the future.

Wreck removal of Ro-Ro Vessel “MV SIRENA” STENEPA reef, Statia (St. Eustatieus )

2017-07 Wreck removal of Ro-Ro Vessel “MV SIRENA” STENEPA reef, Statia (St. Eustatieus )

Removal of a stranded Ro-Ro vessel of 55m mid in between of a high sensitive coral reef, and recovery of 9 containers & vehicles in the Northern Marine Park Reserve of St. Eustatieus.

Hot tapping of Fluvius Tamar, North Sea

2017-04 Hot tapping of Fluvius Tamar, North Sea

Cargo carrier Fluvius Tamar sunk in January 2017 in the North Sea. Residual oil discovered in 40m of water was contained.

Salvage of barge in UAE

2017-02 Salvage of barge in UAE

Salvage of a on a breakwater stranded barge at Mina Saqr Port in the United Arab Emirates.

Wrecked cargo removal mv Vessel, Antwerp, Belgium

2017-02 Wrecked cargo removal mv Vessel, Antwerp, Belgium

Removal of a thousand cars from the 182 meter Ro‐Ro vehicles carrier which endured a fire in the cargo hold while docked in the Port of Antwerp.

Wreck removal of dredger “Astra”

2016-06 Wreck removal of dredger “Astra”

Removal of a stranded 60m long dredger from the Lagos Lagoon.

Refloating of tug boat “OCEAN UANNAQ”

2016-05 Refloating of tug boat “OCEAN UANNAQ”

Salvage/refloat of the sunken tug boat Ocean Uannaq near a bridge in Montreal, Canada.

Stena Spey, Rotterdam, Netherlands

2016-04 Stena Spey, Rotterdam, Netherlands

Remediation of various asbestos containing applications throughout the vessel.

Wreck removal of barge

2016-03 Wreck removal of barge

Removal of a sunken 70x20m deck barge from the Lagos Lagoon.

Wreck removal mv SALOOS, Angola

2016-02 Wreck removal mv SALOOS, Angola

After releasing the wreck from the seabed, the vessel was removed in situ with chisel and torch cutting and all containers and debris originated from M.V. SALOOS were identified and removed.

Cargo removal livestock carrier Haidar

2015-10 Cargo removal livestock carrier Haidar

Porto de Vila do Conde, Brasil - Removal of the oil, liquids, and cattle cargo from capsized carrier Haidar in the harbour Vila do Conde.

Wrecked cargo removal mv COURAGE

2015-05 Wrecked cargo removal mv COURAGE

Bremerhaven, Germany - Removal of eleven hundred cars from the 199 meter Ro‐Ro car carrier which endured a fire in the cargo hold while sailing.

Aircraft AN2 recovery from the Baltic seabed

2015-05 Aircraft AN2 recovery from the Baltic seabed

Offshore Lithuania - An Antonov AN2 crashed into the Baltic Sea at a depth of 125m. A ROV Survey and wreck stabilization operation for casualty removal have been successfully carried out.

Wreck removal cargo vessel mv Luno

2014-08 Wreck removal cargo vessel mv Luno

Bayonne, France - In-situ removal of 110m stranded cargo vessel on the beach of Bayonne, including debris on the sea bed and the beach.

Wreck removal of STS gantry crane APMT

2014-07 Wreck removal of STS gantry crane APMT

Removal of burnt out Liebherr STS gantry crane at the APM Terminal in the port of Lagos.

Wreck removal 100m cement barge

2014-07 Wreck removal 100m cement barge

Lagos, Nigeria - Removal of 100m long sunken cement barge in the harbour of Lagos.

Environmental salvage Daiki Maru

2014-07 Environmental salvage Daiki Maru

The island of Guam, United States - Removal of the long line fishing vessel Daiki Maru grounded on a fragile coral reef located 100 meters in front of a beach. Clearing the beach of all pollutants

Cargo removal from mv Maersk Kampala

2014-02 Cargo removal from mv Maersk Kampala

Removal of hundreds of burned containers from the container vessel MV Maersk Kampala.

Wreck removal of various fishing boats

2014-02 Wreck removal of various fishing boats

Removal of sunken vessels in the harbour of Lagos.

Oil removal from navy oil carrier

2013-12 Oil removal from navy oil carrier

Prince Rupert, Canada - The navy oil carrier ran aground in 1946. Residual oil (700 tons) discovered in 27m of water and removed.

Refloating of fishing vessel Z75 Zeldenrust

2013-10 Refloating of fishing vessel Z75 Zeldenrust

Petten, the Netherlands - The fishing boat was grounded due to nets in the propeller and loss of control. Refloated and towed to the harbour of IJmuiden for an inspection.

Refloating of cargo vessel mv Almeria

2013-10 Refloating of cargo vessel mv Almeria

Kadetrenden, Denmark - Refloating of the stranded cargo vessel mv Almeria.

Oil, fuel and chemical cargo removal from vessel

2013-09 Oil, fuel and chemical cargo removal from vessel

Galapagos Islands, Ecuador - The cargo vessel Galapaface 1 ran aground. Removal of 19,000 gallons of fuel, petroleum products, chemicals, and tons of various cargo. The operation was completed without incidents or accidents and without any damage to the environment.

Salvage of MV Baltic Ace

2013-06 Salvage of MV Baltic Ace

North Sea, the Netherlands - The RoRo cargo vessel Baltic ace sunk following a collision with a container vessel. Dive inspection and oil leakage prevention on a depth of 32m. Deploying the cutting barge MSB3301 for cutting the wreck into eight segments for removal by sheerleg.

Cargo removal from Ro‐Ro vessel Atlantic

2013-05 Cargo removal from Ro‐Ro vessel Atlantic

Cartier, Hamburg, Germany - Removal of thousands of cars from the Grimaldi RoRo vessel Atlantic Cartier which endured fire in its cargo hold. Cargo removal took place in the Port of Hamburg.

Wreck removal MRS barge S215

2013-05 Wreck removal MRS barge S215

Lagos, Nigeria - In site removal and partially refloating of the sunken exploded oil barge in Tincan Island Lagos.

Wreck removal USS Guardian

2013-03 Wreck removal USS Guardian

Palawan, Phillipines - Manual cutting into hoistable segments of the wooden minesweeper USS Guardian which ran aground on a reef.

Refloating of platform supply vessel

2013-03 Refloating of platform supply vessel

San Jose Island, Texas, USA - The supply vessel suffered control failures during weather blows and consequently ran aground. Refloated and returned to her owners.

Refloating of coaster mv Merle

2013-03 Refloating of coaster mv Merle

Aveiro, Portugal - The Merle was beached during a storm. After the re-floating the vessel was towed to Lisbon and delivered to her new Owner.

Parbuckling barge Larvik Rock

2013-03 Parbuckling barge Larvik Rock

Lowesoft, UK - The Larvik Rock barge capsized during towage. Parbuckled the barge in the port of Rotterdam.

Wreck removal steam ship Henri Durré

2013-01 Wreck removal steam ship Henri Durré

Antwerp, Belgium - Removal of a steamship in the river Scheldt, sunken in 1926. The wreck was removed to create space for the expansion of the quay area of INEOS.

Salvage sunken spud leg of jackup vessel Lewek Leader

2013-01 Salvage sunken spud leg of jackup vessel Lewek Leader

Niger Delta, Nigeria - Salvage of a 350 tonne sunken spud leg at 36m depth in the Niger Delta.

Parbuckling tug CMM Coatzacoalcos

2012-11 Parbuckling tug CMM Coatzacoalcos

Veracruz, Mexico - Parbuckled and refloated capsized tug CMM Coatzacoalcos.

Wreck Removal B Oceania

2012-09 Wreck Removal B Oceania

Malacca Strait, Malaysia - Full removal of a panamax size bulk carrier which sank after a collision in the Eastbound shipping lane of the Malacca Straits.

Leg Removal of lift boat Pico 4

2012-09 Leg Removal of lift boat Pico 4

Campeche, Mexico - The 3x legs of lift boat Pico 4 were damaged and cut off. Located and pulled the legs out of the seabed. The legs were landed on a barge and delivered back to our Client in Ciudad del Carmen.

Emergency Response mv Feruz

2012-05 Emergency Response mv Feruz

Samsun, Turkey - The locomotive carrier Feruz stranded on a Black Sea breakwater. Refloated the vessel and brought her to Samsun port.

Wreck removal Helle Saj

2012-05 Wreck removal Helle Saj

Thorsminde, Denmark - Wreck removal of a sunken dredger close to the harbour entrance of Thorsminde.

Wreck Removal of bulk carrier Oriental Hope

2012-02 Wreck Removal of bulk carrier Oriental Hope

South China Sea - The bulker Oriental Hope ran aground and broke into two pieces. The accommodation was washed to shore-side whilst a severe storm sank the forward piece fully laden with her cargo of iron ore. Removal of the complete vessel and cargo.

Salvage stranded drydock

2012-02 Salvage stranded drydock

Sweden - Refloating of a 6,000 tonnes floating drydock, stranded in a preserved natural area.

Wreck Removal fishing vessels Mauritania

2012-02 Wreck Removal fishing vessels Mauritania

Nouadhibou, Mauritania - On the coast of Mauritania 130 fishing lay are abandoned on the beach. The contract for the removal of 74 vessels was granted. A complete demolition site was built to ensure environmental friendly disposal and scrapping of these wrecks.

Environmental Salvage mv Miner

2011-10 Environmental Salvage mv Miner

Scatary Island, Canada - Vessel stranded on the rocks on a remote island in an environmental sanctuary. Removal of the oil and oily residues from the vessel together with all other pollutants to prevent environmental damage.

Refloating of bitumen tanker AB9

2011-09 Refloating of bitumen tanker AB9

Vessel stranded on the rocks on a remote island in an environmental sanctuary. Removal of the oil and oily residues from the vessel together with all other pollutants.

Recovery of SSV Jupiter I

2011-06 Recovery of SSV Jupiter I

A 9.000 ton semi-submersible sank during operations. Refloated the installation and brought her in a safe position without closing the production and pipeline adjacent.

Wreck removal Apollo-S

2010-12 Wreck removal Apollo-S

Port Lincoln, Australia - Removal of tuna fishing boat Apollo-S, applying underwater cutting with an excavator.

Heerema Hermod

2010-11 Heerema Hermod

Atlantic Ocean - Creating an asbestos safe situation.

Refloating of bulk carrier Yue Dian 82

2010-09 Refloating of bulk carrier Yue Dian 82

This vessel ran aground due to main engine failure. The vessel refloated without any damages to the ships structure.

Refloating of brand new research vessel Cabo de Hornos, Talcahuano, Chile

2010-07 Refloating of brand new research vessel Cabo de Hornos, Talcahuano, Chile

Vessel was ready for launch when a Tsunami washed her onto the pier. Placed the vessel on SPMT’s by means of hydraulic jacks and rolled into dry-dock.

Recovery of platform leg of Trident 17

2010-05 Recovery of platform leg of Trident 17

A jack up drilling rig lost her legs during a severe storm. Recovery of the submerged leg from a depth of 85m.

Recovery & launching of a desalination pipeline, English Channel, UK

2010-04 Recovery & launching of a desalination pipeline, English Channel, UK

A floating 500 meter long pipeline was being towed overseas until it was ran over by a container vessel. Pulled the pipe onshore and re-launch it after repair.

Firefighting on-board naval vessel Seri Indrapura, Malacca Strait, Malaysia

2009-09 Firefighting on-board naval vessel Seri Indrapura, Malacca Strait, Malaysia

A Naval Vessel caught fire during repairs in port. Providef firefighting and managed to tow the vessel to a safe zone.

Wreck Removal of the TSC Surpreme,

2009-06 Wreck Removal of the TSC Surpreme,

An OSV collides with the boat landing of a platform, sunk and rested on the jacket structure. Parbuckled and refloated by means of a 2000 ton sheerleg.

Recovery of a cargo of gold Polar Mist,

2009-06 Recovery of a cargo of gold Polar Mist,

Southern Ocean - A converted fishing vessel sunk with a precious cargo of gold minerals in the Southern Ocean. With the aid of divers and ROV’s the wreck was located and all the cargo recovered from a depth of 80 meter.

Recovery of a fuel truck from Robson Bight

2009-05 Recovery of a fuel truck from Robson Bight

Vancouver, Canada - A fuel truck fell off a logging barge in the middle of a killer whale sanctuary threatening local wild-life. With the aid of deep water recovery containment casing the truck was recovered from a depth of 360 meters without any oil spillage.

Cargo removal Norsul

2008-11 Cargo removal Norsul

Ilha Maiau, Brazil - Recovery of hundreds of rolls of steel from the bottom of the sea from a cargo ship that ran aground in 1989.

Environmental Salvage fishing vessel Spinningdale

2008-04 Environmental Salvage fishing vessel Spinningdale

St Kilda, Northern Atlantic - The vessel stranded on the rocks of this deserted island and bird sanctuary that is an UNESCO World heritage site. Removal of the vessels pollutants before the start of the breeding season.

Recovery of aluminium cargo of Runner 4

2007-08 Recovery of aluminium cargo of Runner 4

Baltic sea, Estonia - General cargo vessel sank with 7000 blocks of aluminium (each 750kg). Recovery of these blocks from a depth of 100m1 with the in-house engineered and built a deep water recovery system.

Cargo removal from Republica di Genova

2007-04 Cargo removal from Republica di Genova

Antwerp, Belgium - Removal of thousands of cars and dozens of trucks from the 216 meter capsized RoRo vessel Republica di Genova owned by Grimaldi Lines in the Port of Antwerp.

Cargo removal from Republica di Genova

2007-03 Cargo removal from Republica di Genova

Antwerp, Belgium - Removal of thousands of cars and dozens of trucks from the 216 meter capsized ferryboat Republica di Genova (Grimaldi Lines).

Recovery of a F16 fighter aircraft

2006-11 Recovery of a F16 fighter aircraft

F-16 fighter plane ditched into the sea. The remains of the plane were salved and transported back to the shore.

Recovery of cargo and removal barge Thor

2006-05 Recovery of cargo and removal barge Thor

Antwerp, Belgium - The inland push barge sank with a full cargo of steel plates (340 pieces / 2,800 tons) whilst waiting for the locks. The entire cargo was salved and delivered back to the rightful owners. The barge was hereafter removed in two pieces and delivered on-shore.

Removal of container vessel Safmarine Agulhas

2006-05 Removal of container vessel Safmarine Agulhas

Vessel grounded at the breakwaters during heavy seas. Complete removal of cargo and vessel from breakwater.

2017-11 KOOLE MAMMOET Salvage offered aid to Saint Martin

KOOLE has completed various operations and wreck salvages. We have helped to restore the port and discharging naval vessels loaded with material for the reconstruction of the island.

KOOLE MAMMOET Salvage offered aid to Saint Martin

2017-10 KOOLE MAMMOET Salvage has launched the “BEACHCOMBER VII” successfully

KOOLE MAMMOET Salvage has rolled back the "BEACHCOMBER VII", by using a self-created slipway of steel pipes, over the beach to the sea.

KOOLE MAMMOET Salvage has launched the “BEACHCOMBER VII” successfully

2017-09 KOOLE MAMMOET Salvage brings back the “MV JENIN” to owner

The "MV JENIN" was put upright but bad weather made a lifting operation impossible. The "MV JENIN" was moved underwater to a better location awaiting better weather conditions. The "MV JENIN" was transported back to its owners in Umm Al Qwain.

KOOLE MAMMOET Salvage brings back the “MV JENIN” to owner

2017-08 KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, Sint Maarten

KOOLE MAMMOET Salvage obtained the contract to remove the "EL MAUD" and clean its close surroundings so that the area can be further developed in the future.

KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, Sint Maarten

2017-08 KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, St. Maarten

KOOLE MAMMOET Salvage obtained the contract to remove the "EL MAUD" and clean its close surroundings so that the area can be further developed in the future.

KOOLE MAMMOET Salvage has successfully salvaged the wreck of the “EL MAUD” in Maigot bay, St. Maarten

2017-07 Wreck removal of Ro-Ro Vessel “MV SIRENA” STENEPA reef, Statia (St. Eustatieus )

Removal of a stranded Ro-Ro vessel of 55m mid in between of a high sensitive coral reef, and recovery of 9 containers & vehicles in the Northern Marine Park Reserve of St. Eustatieus.

Wreck removal of Ro-Ro Vessel “MV SIRENA” STENEPA reef, Statia (St. Eustatieus )

2017-04 Hot tapping of Fluvius Tamar, North Sea

Cargo carrier Fluvius Tamar sunk in January 2017 in the North Sea. Residual oil discovered in 40m of water was contained.

Hot tapping of Fluvius Tamar, North Sea

2017-02 Salvage of barge in UAE

Salvage of a on a breakwater stranded barge at Mina Saqr Port in the United Arab Emirates.

Salvage of barge in UAE

2017-02 Wrecked cargo removal mv Vessel, Antwerp, Belgium

Removal of a thousand cars from the 182 meter Ro‐Ro vehicles carrier which endured a fire in the cargo hold while docked in the Port of Antwerp.

Wrecked cargo removal mv Vessel, Antwerp, Belgium

2016-06 Wreck removal of dredger “Astra”

Removal of a stranded 60m long dredger from the Lagos Lagoon.

Wreck removal of dredger “Astra”

2016-05 Refloating of tug boat “OCEAN UANNAQ”

Salvage/refloat of the sunken tug boat Ocean Uannaq near a bridge in Montreal, Canada.

Refloating of tug boat “OCEAN UANNAQ”

2016-04 Stena Spey, Rotterdam, Netherlands

Remediation of various asbestos containing applications throughout the vessel.

Stena Spey, Rotterdam, Netherlands

2016-03 Wreck removal of barge

Removal of a sunken 70x20m deck barge from the Lagos Lagoon.

Wreck removal of barge

2016-02 Wreck removal mv SALOOS, Angola

After releasing the wreck from the seabed, the vessel was removed in situ with chisel and torch cutting and all containers and debris originated from M.V. SALOOS were identified and removed.

Wreck removal mv SALOOS, Angola

2015-10 Cargo removal livestock carrier Haidar

Porto de Vila do Conde, Brasil - Removal of the oil, liquids, and cattle cargo from capsized carrier Haidar in the harbour Vila do Conde.

Cargo removal livestock carrier Haidar

2015-05 Wrecked cargo removal mv COURAGE

Bremerhaven, Germany - Removal of eleven hundred cars from the 199 meter Ro‐Ro car carrier which endured a fire in the cargo hold while sailing.

Wrecked cargo removal mv COURAGE

2015-05 Aircraft AN2 recovery from the Baltic seabed

Offshore Lithuania - An Antonov AN2 crashed into the Baltic Sea at a depth of 125m. A ROV Survey and wreck stabilization operation for casualty removal have been successfully carried out.

Aircraft AN2 recovery from the Baltic seabed

2014-08 Wreck removal cargo vessel mv Luno

Bayonne, France - In-situ removal of 110m stranded cargo vessel on the beach of Bayonne, including debris on the sea bed and the beach.

Wreck removal cargo vessel mv Luno

2014-07 Wreck removal of STS gantry crane APMT

Removal of burnt out Liebherr STS gantry crane at the APM Terminal in the port of Lagos.

Wreck removal of STS gantry crane APMT

2014-07 Wreck removal 100m cement barge

Lagos, Nigeria - Removal of 100m long sunken cement barge in the harbour of Lagos.

Wreck removal 100m cement barge

2014-07 Environmental salvage Daiki Maru

The island of Guam, United States - Removal of the long line fishing vessel Daiki Maru grounded on a fragile coral reef located 100 meters in front of a beach. Clearing the beach of all pollutants

Environmental salvage Daiki Maru

2014-02 Cargo removal from mv Maersk Kampala

Removal of hundreds of burned containers from the container vessel MV Maersk Kampala.

Cargo removal from mv Maersk Kampala

2014-02 Wreck removal of various fishing boats

Removal of sunken vessels in the harbour of Lagos.

Wreck removal of various fishing boats

2013-12 Oil removal from navy oil carrier

Prince Rupert, Canada - The navy oil carrier ran aground in 1946. Residual oil (700 tons) discovered in 27m of water and removed.

Oil removal from navy oil carrier

2013-10 Refloating of fishing vessel Z75 Zeldenrust

Petten, the Netherlands - The fishing boat was grounded due to nets in the propeller and loss of control. Refloated and towed to the harbour of IJmuiden for an inspection.

Refloating of fishing vessel Z75 Zeldenrust

2013-10 Refloating of cargo vessel mv Almeria

Kadetrenden, Denmark - Refloating of the stranded cargo vessel mv Almeria.

Refloating of cargo vessel mv Almeria

2013-09 Oil, fuel and chemical cargo removal from vessel

Galapagos Islands, Ecuador - The cargo vessel Galapaface 1 ran aground. Removal of 19,000 gallons of fuel, petroleum products, chemicals, and tons of various cargo. The operation was completed without incidents or accidents and without any damage to the environment.

Oil, fuel and chemical cargo removal from vessel

2013-06 Salvage of MV Baltic Ace

North Sea, the Netherlands - The RoRo cargo vessel Baltic ace sunk following a collision with a container vessel. Dive inspection and oil leakage prevention on a depth of 32m. Deploying the cutting barge MSB3301 for cutting the wreck into eight segments for removal by sheerleg.

Salvage of MV Baltic Ace

2013-05 Cargo removal from Ro‐Ro vessel Atlantic

Cartier, Hamburg, Germany - Removal of thousands of cars from the Grimaldi RoRo vessel Atlantic Cartier which endured fire in its cargo hold. Cargo removal took place in the Port of Hamburg.

Cargo removal from Ro‐Ro vessel Atlantic

2013-05 Wreck removal MRS barge S215

Lagos, Nigeria - In site removal and partially refloating of the sunken exploded oil barge in Tincan Island Lagos.

Wreck removal MRS barge S215

2013-03 Wreck removal USS Guardian

Palawan, Phillipines - Manual cutting into hoistable segments of the wooden minesweeper USS Guardian which ran aground on a reef.

Wreck removal USS Guardian

2013-03 Refloating of platform supply vessel

San Jose Island, Texas, USA - The supply vessel suffered control failures during weather blows and consequently ran aground. Refloated and returned to her owners.

Refloating of platform supply vessel

2013-03 Refloating of coaster mv Merle

Aveiro, Portugal - The Merle was beached during a storm. After the re-floating the vessel was towed to Lisbon and delivered to her new Owner.

Refloating of coaster mv Merle

2013-03 Parbuckling barge Larvik Rock

Lowesoft, UK - The Larvik Rock barge capsized during towage. Parbuckled the barge in the port of Rotterdam.

Parbuckling barge Larvik Rock

2013-01 Wreck removal steam ship Henri Durré

Antwerp, Belgium - Removal of a steamship in the river Scheldt, sunken in 1926. The wreck was removed to create space for the expansion of the quay area of INEOS.

Wreck removal steam ship Henri Durré

2013-01 Salvage sunken spud leg of jackup vessel Lewek Leader

Niger Delta, Nigeria - Salvage of a 350 tonne sunken spud leg at 36m depth in the Niger Delta.

Salvage sunken spud leg of jackup vessel Lewek Leader

2012-11 Parbuckling tug CMM Coatzacoalcos

Veracruz, Mexico - Parbuckled and refloated capsized tug CMM Coatzacoalcos.

Parbuckling tug CMM Coatzacoalcos

2012-09 Wreck Removal B Oceania

Malacca Strait, Malaysia - Full removal of a panamax size bulk carrier which sank after a collision in the Eastbound shipping lane of the Malacca Straits.

Wreck Removal B Oceania

2012-09 Leg Removal of lift boat Pico 4

Campeche, Mexico - The 3x legs of lift boat Pico 4 were damaged and cut off. Located and pulled the legs out of the seabed. The legs were landed on a barge and delivered back to our Client in Ciudad del Carmen.

Leg Removal of lift boat Pico 4

2012-05 Emergency Response mv Feruz

Samsun, Turkey - The locomotive carrier Feruz stranded on a Black Sea breakwater. Refloated the vessel and brought her to Samsun port.

Emergency Response mv Feruz

2012-05 Wreck removal Helle Saj

Thorsminde, Denmark - Wreck removal of a sunken dredger close to the harbour entrance of Thorsminde.

Wreck removal Helle Saj

2012-02 Wreck Removal of bulk carrier Oriental Hope

South China Sea - The bulker Oriental Hope ran aground and broke into two pieces. The accommodation was washed to shore-side whilst a severe storm sank the forward piece fully laden with her cargo of iron ore. Removal of the complete vessel and cargo.

Wreck Removal of bulk carrier Oriental Hope

2012-02 Salvage stranded drydock

Sweden - Refloating of a 6,000 tonnes floating drydock, stranded in a preserved natural area.

Salvage stranded drydock

2012-02 Wreck Removal fishing vessels Mauritania

Nouadhibou, Mauritania - On the coast of Mauritania 130 fishing lay are abandoned on the beach. The contract for the removal of 74 vessels was granted. A complete demolition site was built to ensure environmental friendly disposal and scrapping of these wrecks.

Wreck Removal fishing vessels Mauritania

2011-10 Environmental Salvage mv Miner

Scatary Island, Canada - Vessel stranded on the rocks on a remote island in an environmental sanctuary. Removal of the oil and oily residues from the vessel together with all other pollutants to prevent environmental damage.

Environmental Salvage mv Miner

2011-09 Refloating of bitumen tanker AB9

Vessel stranded on the rocks on a remote island in an environmental sanctuary. Removal of the oil and oily residues from the vessel together with all other pollutants.

Refloating of bitumen tanker AB9

2011-06 Recovery of SSV Jupiter I

A 9.000 ton semi-submersible sank during operations. Refloated the installation and brought her in a safe position without closing the production and pipeline adjacent.

Recovery of SSV Jupiter I

2010-12 Wreck removal Apollo-S

Port Lincoln, Australia - Removal of tuna fishing boat Apollo-S, applying underwater cutting with an excavator.

Wreck removal Apollo-S

2010-11 Heerema Hermod

Atlantic Ocean - Creating an asbestos safe situation.

Heerema Hermod

2010-09 Refloating of bulk carrier Yue Dian 82

This vessel ran aground due to main engine failure. The vessel refloated without any damages to the ships structure.

Refloating of bulk carrier Yue Dian 82

2010-07 Refloating of brand new research vessel Cabo de Hornos, Talcahuano, Chile

Vessel was ready for launch when a Tsunami washed her onto the pier. Placed the vessel on SPMT’s by means of hydraulic jacks and rolled into dry-dock.

Refloating of brand new research vessel Cabo de Hornos, Talcahuano, Chile

2010-05 Recovery of platform leg of Trident 17

A jack up drilling rig lost her legs during a severe storm. Recovery of the submerged leg from a depth of 85m.

Recovery of platform leg of Trident 17

2010-04 Recovery & launching of a desalination pipeline, English Channel, UK

A floating 500 meter long pipeline was being towed overseas until it was ran over by a container vessel. Pulled the pipe onshore and re-launch it after repair.

Recovery & launching of a desalination pipeline, English Channel, UK

2009-09 Firefighting on-board naval vessel Seri Indrapura, Malacca Strait, Malaysia

A Naval Vessel caught fire during repairs in port. Providef firefighting and managed to tow the vessel to a safe zone.

Firefighting on-board naval vessel Seri Indrapura, Malacca Strait, Malaysia

2009-06 Wreck Removal of the TSC Surpreme,

An OSV collides with the boat landing of a platform, sunk and rested on the jacket structure. Parbuckled and refloated by means of a 2000 ton sheerleg.

Wreck Removal of the TSC Surpreme,

2009-06 Recovery of a cargo of gold Polar Mist,

Southern Ocean - A converted fishing vessel sunk with a precious cargo of gold minerals in the Southern Ocean. With the aid of divers and ROV’s the wreck was located and all the cargo recovered from a depth of 80 meter.

Recovery of a cargo of gold Polar Mist,

2009-05 Recovery of a fuel truck from Robson Bight

Vancouver, Canada - A fuel truck fell off a logging barge in the middle of a killer whale sanctuary threatening local wild-life. With the aid of deep water recovery containment casing the truck was recovered from a depth of 360 meters without any oil spillage.

Recovery of a fuel truck from Robson Bight

2008-11 Cargo removal Norsul

Ilha Maiau, Brazil - Recovery of hundreds of rolls of steel from the bottom of the sea from a cargo ship that ran aground in 1989.

Cargo removal Norsul

2008-04 Environmental Salvage fishing vessel Spinningdale

St Kilda, Northern Atlantic - The vessel stranded on the rocks of this deserted island and bird sanctuary that is an UNESCO World heritage site. Removal of the vessels pollutants before the start of the breeding season.

Environmental Salvage fishing vessel Spinningdale

2007-08 Recovery of aluminium cargo of Runner 4

Baltic sea, Estonia - General cargo vessel sank with 7000 blocks of aluminium (each 750kg). Recovery of these blocks from a depth of 100m1 with the in-house engineered and built a deep water recovery system.

Recovery of aluminium cargo of Runner 4

2007-04 Cargo removal from Republica di Genova

Antwerp, Belgium - Removal of thousands of cars and dozens of trucks from the 216 meter capsized RoRo vessel Republica di Genova owned by Grimaldi Lines in the Port of Antwerp.

Cargo removal from Republica di Genova

2007-03 Cargo removal from Republica di Genova

Antwerp, Belgium - Removal of thousands of cars and dozens of trucks from the 216 meter capsized ferryboat Republica di Genova (Grimaldi Lines).

Cargo removal from Republica di Genova

2006-11 Recovery of a F16 fighter aircraft

F-16 fighter plane ditched into the sea. The remains of the plane were salved and transported back to the shore.

Recovery of a F16 fighter aircraft

2006-05 Recovery of cargo and removal barge Thor

Antwerp, Belgium - The inland push barge sank with a full cargo of steel plates (340 pieces / 2,800 tons) whilst waiting for the locks. The entire cargo was salved and delivered back to the rightful owners. The barge was hereafter removed in two pieces and delivered on-shore.

Recovery of cargo and removal barge Thor

2006-05 Removal of container vessel Safmarine Agulhas

Vessel grounded at the breakwaters during heavy seas. Complete removal of cargo and vessel from breakwater.

Removal of container vessel Safmarine Agulhas
Next Trackrecord

Cases

Salvage of stranded floating dry dock

Salvage of stranded floating dry dock >>

In order to salvage a stranded dock and preserve the environment, an 800 metre basin was built around the dock, after which the dock was refloated and towed back to the harbour through a 1.8 km excavated canal.

Removal of stranded cargo ship wreck

Removal of stranded cargo ship wreck >>

Removing a cargo ship that was stranded in two pieces, at both sides of a breakwater. By means of chain pullers, the segments were towed on the beach, and with excavators, cranes and cutting torches the segments were reduced to container sized pieces for disposal.

Wreck removal mv SALOOS

Wreck removal mv SALOOS >>

Roll-on-roll-off container vessel SALOOS capsized in May 2014 at Cabinda anchorage in Angola, carrying 155 containers and cargo. After the grounding of the vessel, an unknown amount of containers was scattered in an area of 60 km² with several containers stranded on the beach. KOOLE was contracted in 2015 to remove the complete vessel, survey the area of 60 km² and remove all detected containers and debris.

  • KOOLE head office
  • Vijfhuizerdijk 110
  • 2141 BD Vijfhuizen
  • The Netherlands
  • T +31(0)23 558 19 37
  • KOOLE nv
  • Elzasweg 13/B
  • 2030 Antwerp
  • Belgium
  • T +32(0)347 50 78 3
  • KOOLE MAMMOET Salvage Singapore Pte. Ltd.
  • Singapore
  • T (+31)6 33 71 76 36
  • T (+31)6 46 36 86 62
  •  
Back to top